Categorical Exclusion Determinations: B3.6

This revision is for Oklo to install temporary power lines to the Aurora-INL project site, install a production well at the Aurora-INL site, and utilize an MFC construction water supply source to provide water to support Aurora-INL limited construction activities.
Work will be completed in a contamination area and tritiated materials will be studied. These materials will be analyzed in small quantities and co…