Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, A11, B3.1, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0008794, CX(s) Applied: A9, A11, B3.1, Geothermal Technologies Office, Location(s): TX, Office(s): Golden Field Office
Design, engineer, fabricate, lab test, and then field test a well logging system for unconventional boreholes.…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Spook disposal site. Aerial survey control monume…
DOE LM is proposing to install aerial survey monuments for future aerial survey activities at the Edgemont disposal site. Monuments would be constr…
A New Jersey licensed well drilling subcontractor would properly seal and decommission eleven (11) ground water monitoring wells. …
Design, install, and operate a plasma ignition system at full scale to validate achievement of lower load, improved flame stabilization, lower oper…
DOE LM is proposing to install aerial survey quality control monuments for future aerial survey activities at the Shirley Basin South, disposal sit…
Pursuant to encouraging results from the 2013/2015 Aerobic Bio-stimulation bench scale study using humate to treat Southern Sector groundwater cont…
BPA is in the scoping process for a new radio station tentatively named “Butte” Radio Station, to be located about 4.5 miles east of downtown Butte…