This CX is for Subtask 3.2 Produced Water Management Through Geologic Homogenization, Conditioning and Reuse under DOE Project DE-FE0024233.…
Replace the area velocity flow sensor in the culvert at liquid effluent outfall F-05.…
The M&O would continue to conduct seismic monitoring at existing sites for an indefinite period of time. …
Replacement of Area Velocity Flow Sensor at Stream Surveillance Location FM-A7…
This project includes taking soil samples at the H, K, and L-Area Ash Basins, and conducting visual inspections for ash along transects todelineate…
Push 3 CPTs down to lower part of Lower Aquifer Zone (LAZ) for lithology.…
Landowners adjacent to the Idaho National Laboratory (INL) Site’s northeast boundary have encroached on INL property. The proposed action surveys a…
Up to 17 survey lines are proposed for SASW testing near seismic velocity boreholes and existing INL seismic stations at: ATR (Figure R-1A), NRF (F…
Award Number: DE-EE0008729, CX(s) Applied: A9, B3.1, B3.3, B3.6, Wind Energy Technologies Office, Location(s): IA, Office(s): Golden Field Office
Award Number: DE-EE0008990, CX(s) Applied: A9, B3.1, B3.6, Solar Energy Technologies Office, Location(s): MI, Office(s): Golden Field Office