Revision 1 adds additional scope related to seismic testing. See uploaded file of EC. The proposed action performs site characterization studies to…
Methane measuring-both direct and airborne monitoring-will be conducted at multiple wellsite locations throughout different oil and gas producing r…
Bonneville Power Administration (BPA) proposes to allow PBS Engineering and Environmental, Inc. (PBS) on behalf of the City of Vancouver to conduct…
UT will conduct a field laboratory validation of a sensor system that provides data at UT’s Devine Geophysical Test Site.…
Construction and operation of a pilot-scale integrated AMD treatment plant and REE recovery plant at an abandoned mine owned by WVDEP; Project Mana…
The activities covered in this CX are for using active electro seismic (ASE) in place of PES. CXs for UND EERC locations in Grand Forks, ND and Gre…
Bonneville Power Administration (Bonneville) proposes to respond to low inflow conditions at Lake Roosevelt, the reservoir behind Grand Coulee Dam,…
The Kesselring Site Sealing of Site Service Water (SSW) Well 4 and Abandoned Test Well Project involves the decommissioning of 11 groundwater monitor…
Micro Scale Rock/Fluid Experiments, 3D printed fractured core development, prototype development and testing, microchip integration near well bore/…
LM is proposing to conduct inventory, mapping, and soil and surface water sampling at abandoned uranium mines in the state of Montana in accordance…