Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
Flow sensors are planned for installation at two locations in D Area. One will be installed in the discharge canal (DSWM-8B) and D006 outfall (DSWM…
Four additional monitoring wells will be installed at the Northern Sector of the M-Area Hazardous Waste Management Facility, as a condition of the …
Oklo is developing next-generation fission power plants to produce abundant, affordable, clean energy.…
Identifying key technical knowledge gaps,facilitating data acquisition, sharing,analysis to close the gaps, evaluating regional infrastructure,prom…
This project investigates a novel process that employs task-specific ionic liquids (ILs) in two stages to enhance the recovery of REEs.…
CX-029744: Routine Administrative, Monitoring, and Maintenance Activities at Gnome-Coach, New Mexico
DOE-LM isproposing to conduct routine administrative, monitoring, and maintenance activities at the Gnome-Coach, New Mexico, Site, located approxim…
The U.S. Department of Energy (DOE) proposed action is to provide a loan guarantee to LongPath Technologies, Inc. (hereinafter “LongPath”) as borro…
The following work will be completed in the Functional Test Station (FTS): replace the filament and ion gauge for the Real Time Mass Spectrometer a…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…