Collect coal and other resource samples:grab sampling from exposed coal seam faces from operating mines, and outcrops using hand tools.…
Exploratory borehole will be drilled and logged to 2,500 feet below ground surface in Craig County, Virginia. Scope of work includes site preparati…
Complete Design Development, Environmental Information Volume (EIV), Investment Case and a FEED study to redevelop the existing Recipient's Coal Ga…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to the University of Alaska Fairbanks (UAF) to design and implement an …
The Decontamination and Decommissioning Projects Contracted by the Naval Nuclear Laboratory will
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
remediate, dismantle, and dispose of select above grade structures and select components associated with Building 4E (Auxiliary Equipment Building), Building
LM is proposing to conduct routine activities at the Lowman site located in Boise County.…
Characterization activities for CO2 storage complex to include: drilling stratigraphic test well; wireline logging; well coring; lab experiments; s…
Identify key barriers and opportunities in connecting CORE-CM materials in the area. Stream sampling locations in 12 key counties, North Central W…
LM is proposing to conduct routine activities at the Central Nevada Test Area (CNTA), Nevada Offsite (NVOS) located in central Nevada 70 miles nort…
This revision to the Environmental Compliance Permit (ECP) for the Utah Associated Municipal Power System (UAMPS) Carbon Free Power Project (CFPP) …