The Knolls Laboratory H1 Cooling Tower [Area of Concern (AOC)-007] Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Project is being undertaken to investigate the nature and extent of metals, primarily chromium and hexavalent chromium, and polychlorinated biphenyls in soil and groundwater.
LM is proposing to conduct routine administrative, monitoring, and maintenance activities at the Gasbuggy, New Mexico, Site, located approximately …
OCED is proposing to provide funding to Entergy Services, LLC in support of the Lake Charles Power Station Integrated CO2 Capture Project. …
This EEC covers the collect of surface water samples and processing of samples collected from various non-radiological areas on SRS within the lab …
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform site characterization and environmental monitoring (including, but no…
Central Plateau Cleanup Company (CPCCo) and its subcontractors perform site characterization and environmental monitoring (including, but not limit…
A number of lysimeters are to be installed around Saltstone Disposal Unit (SDU) 6 for detection of radioactive and chemical contamination in surrou…
OCED is proposing to provide funding to Southern States Energy Board in support of the Foreman Cement Plant Carbon Capture and Storage (CCS) Front …
OCED is proposing to provide funding to Tampa Electric Company in support of the Polk Power Station Integrated CO2 Capture Project. …
Work consists of a combination of model simulations, controlled laboratory studies, and a field study to identify the dispersion and settling prope…