Collection of samples in support Subtask 2.5 of the SOPO.…
The U.S. Department of Energy’s (DOE) National Renewable Energy Laboratory (NREL) is proposing to provide technical assistance to the Federal Geoth…
Administrative and project management activities
CarbonSAFE Phase II project, TCCSP team will seek to verify geologic suitability of the storage site by drilling a stratigraphic test well at the C…
Subtask 4.1 Stratigraphic test well drilling. Build a well pad and an access road. …
The USGS gage at Big Lost R at Lincoln Blvd Bridge (13132535) needs to be relocated due to ongoing issues with the current location. Part of this w…
The U.S. Department of Energy (DOE) is proposing to provide funding to Hearth Labs Solutions, Inc. to develop technology using non-invasive scannin…
Geotechnical Engineering Group will be taking bore samples of soil at the Burma Road Borrow Pit…
WAPA proposes to repair erosion damage at selected access roads in western Fresno County between Towers 50-1 and 57-1.…