Proj management, NEPA documentation, UIC Class VI permit prep, data gathering, storage field dev plan, source feasibility study, pipeline FEED stud…
Abandon wells BSE-003C, BSW-002C, and NEP-001D, and install replacement wells BSE-003CR, BSW-002CR, NEP-001DR for the Mixed Waste Management and Fa…
OCED is proposing to provide funding to Calpine Texas CCUS Holdings, LLC in support of the Baytown CCS Decarbonization Project at Calpine's Baytown…
This Environmental Evaluation Checklist discusses the installation of piping, transformer, distribution panel, electrical components, and a catalyt…
Re-develop 22 piezometers and 2 inclinometers in the vicinity of the Steel Creek Dam, and 48 piezometers in the vicinity of PAR Pond Dam. Eleven (1…
The Western Sector Treatment System (WSTS) operates under a United States Environmental Protection Agency (USEPA) risk-based approval for polychlor…
The scope of work is to cut and extract five (5) asphalt cores as representative samples from the intersection in front of 704-1N and 715-3N to mea…
Bonneville Power Administration (BPA) proposes to perform geotechnical testing, soil resistivity testing and water infiltration tests at the La Pin…
This Sixth Amended Determination follows a field location change to support the project team's small-scale research and development activities to d…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Metlakatla Indian Community to design, procure, and construct a 1.5-mega…