North Carolina-County-Johnston CX(s) Applied: B2.5, B5.1 Date: 12/12/2011 Location(s): North Carolina Offices(s): Energy Efficiency and Renewable Energy
New Hampshire-City-Manchester CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 12/12/2011 Location(s): New Hampshire Offices(s): Energy Efficiency and Renewable Energy
Kentucky-City-Owensboro CX(s) Applied: A9, A11, B2.5, B5.1 Date: 12/12/2011 Location(s): Kentucky Offices(s): Energy Efficiency and Renewable Energy
California-City-Davis CX(s) Applied: A1, A9, B1.32, B2.5, B5.1 Date: 12/12/2011 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
B94 Hazardous Gas Alarms CX(s) Applied: B1.29, B2.1, B2.2, B2.3, B2.5 Date: 12/09/2011 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory
Install an Alternate Air Purge for the Phase II Receipt Tanks (JT-71/7) CX(s) Applied: B2.5 Date: 12/08/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Nevada-TRIBE-YOMBA SHOSHONE TRIBE CX(s) Applied: B2.5, B5.1 Date: 12/08/2011 Location(s): Nevada Offices(s): Energy Efficiency and Renewable Energy
California-City-Mountain View CX(s) Applied: A9, B1.32, B2.5, B5.1 Date: 12/08/2011 Location(s): California Offices(s): Energy Efficiency and Renewable Energy
Domestic Water to River Water Cross Connection for the Biomass Cogeneration Facility CX(s) Applied: B2.5 Date: 11/30/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office
Texas-City-Odessa CX(s) Applied: B2.5, B5.1 Date: 11/22/2011 Location(s): Texas Offices(s): Energy Efficiency and Renewable Energy