Louisiana- County - Lafourche CX(s) Applied: B2.5, B5.1 Date: 02/07/2012 Location(s): Louisiana Offices(s): Energy Efficiency and Renewable Energy
Minnesota -County - Carver CX(s) Applied: A9, A11, B2.5, B5.1 Date: 02/03/2012 Location(s): Minnesota Offices(s): Energy Efficiency and Renewable Energy
Alabama County - Baldwin CX(s) Applied: B2.5, B5.1 Date: 01/30/2012 Location(s): Alabama Offices(s): Energy Efficiency and Renewable Energy
Building 040 Seismic Upgrade CX(s) Applied: B2.5 Date: 01/27/2012 Location(s): California Offices(s): Stanford Linear Accelerator Site Office
Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region
Lapeyre Stair Installation CX(s) Applied: B2.5 Date: 01/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replace 802-H Platform/Control Valve Ladder with New Lapeyre Stairs CX(s) Applied: B2.5 Date: 01/19/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Fire Suppression System Modifications, 772-1F CX(s) Applied: B2.5 Date: 01/18/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Kentucky-County-Kenton CX(s) Applied: B2.5, B5.1 Date: 01/17/2012 Location(s): Kentucky Offices(s): Energy Efficiency and Renewable Energy
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B2.5 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office