Argus Access Controls will be added to Door 156 in Building 717-K.…
Provide fire sprinkler suppression and fire alarm (exhaust duct) smoke detection in Facility 234-7H…
Install new sprinkler heads (or relocate existing ones, if possible) throughout Building 704-71S where missing and adjust existing sprinkler head l…
Replacement of 704-Z Fire Alarm Panel due to it being obsolete.…
Install indoor PA speakers per attached work instructions in 703-A,784-3A, 784-1A, 703-46A, 703-45A, 723-A, 773-52A, 703-43A, 703-42A, 737-24A, 730…
The U.S. Department of Energy (DOE) administers the Weatherization Assistance Program (WAP) authorized by Title IV, Energy Conservation and Product…
The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001
Design and install new stand-alone permissive circuits for Safety Significant (SS) portions of the door scheme along with all the remaining permiss…
Radiation monitors that are no longer needed are being removed from service and abandoned in place.…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to The Ohio State University (OSU) to develop coordinated control softw…