Install exterior speakers in C-Area.…
A Composite Lower Flammability Limit (CLFL) Monitoring Station is being installed on Saltstone Disposal Units (SDU) 3A and 3B.…
Install outdoor PA speakers per attached work instructions in 703-41A, 703-42A, 703-43A, 702-2A, 730-4B, 711-1N and 706-N. Revision 1 needed to add…
New Fiber Optic Cables are to be installed in the Defense Waste Processing Facility.…
New Fiber Optic Cables are to be installed in the Defense Waste Processing Facility.…
A permanent mount camera is to be installed in the Defense Waste Processing Facility Chemical Processing Facility.…
The project will no longer be installing a septic system and will instead install a sewer line connecting to the existing sewage lagoons located no…
RIT-1029 is being removed from service since it is no longer needed.…
Remove current fire alarm equipment and install new equipment in its place.…
The installation of IAEA surveillance systems and electrical power in the Criticality Control Overpacks (CCO) Pad Storage Facility, 163-70K, to all…