CX-020237: Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator
Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator.…
The Knolls Laboratory Central Computing Facility Long Term Upgrade Project will support the future computing needs of the Naval Reactors Program by…
This Categorical Exclusion covers routine renovation and maintenance activities of a general and repetitive nature which include installation, modi…
Subcontractor shall provide all supervision, transportation, labor, materials and equipment required to replace an existing Baltimore AirCoil Compa…
Categorical Exclusion Determination
Categorical Exclusion Determination
Central Computer Facility Upgrade Project CX(s) Applied: B1.4, B1.5, B1.7, B1.15, B1.16, B 1.17Date: 10/19/2016 Location(s): New YorkOffices(s): Naval Nuclear Propulsion Program
Install Nalco Chemistry Control System in 241-98H CX(s) Applied: B1.5Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Boiler Blowdown Tank Project CX(s) Applied: B1.5, B1.15, B1.23, B2.5Date: 07/13/2016 Location(s): New YorkOffices(s): Naval Nuclear Propulsion Program
Building 59 Upgrade and NERSC Upgrades, Installation, and Operation LB-CX-16-01 CX(s) Applied: B1.5, B1.15, B1.31, B1.7Date: 04/08/2016 Location(s): CaliforniaOffices(s): Berkeley Site Office