Bag filters will be installed to the cooling water return flush line feeds of the 285-H Cooling Water System's basin for a trial run.…
The proposed action would permit routine maintenance and minor upgrades to existing Brookhaven National Laboratory facilities.…
Bag filters will be installed to the make-up water feed (domestic water) of the K-Area Chilled Water System due to frequent clogging.…
The proposed work would extend the cooling water drain piping out approximately 4 ft. and tie into a nearby underground storm water roof drain pipe.
After an assessment of the trial run of using Chem Treat CL4132 in the 285-11H system, it's been determined that the facility will design the setup…
The scope of this project is to provide chiller water to instruments and systems within the MFC-1729 Irradiated Materials Characterization Laborato…
The Critical Utilities Rehabilitation Project (CURP) at Brookhaven National Laboratory includes replacement and/or upgrades and improvements to the…
Trial run using ChemTreat CL4132 in 285-11H to reduce metal corrosion in H-Canyon cooling systems and subsequently reduce copper levels in H-12 Out…
This actvity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flume…
This project will replace the current UPS flywheel system with a newer, state-of-the-art system.…