Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
High Frequency Sounder - Permanent Installation at Water Reactor Research Test Facility CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Shaniko Radio Station Replacement Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Tunk Mountain Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office
One Nevada Optimization of Microwave Telecommunication System CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada, Offices(s): Loan Guarantee Program Office
Giant Track Communications Tower Removal CX(s) Applied: B1.19 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Electrical District 2 - Saguaro No. 1 Pole Replacement CX(s) Applied: B1.3, B1.16, B1.19, B1.23 Date: 11/22/2011 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Black Point Communication Site Building Replacement CX(s) Applied: B1.3, B1.16, B1.19, B1.23 Date: 10/17/2011 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region