The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment,transmission towers, and auxiliary elec…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of the property and subsequent demolition, remova...
CX-021109: MSC Annual Categorical Exclusion (CX) B1.17, Polychlorinated Biphenyl Removal for CY 2020
The Mission Support Contractor (MSC) and its subcontractors perform removal of Polychlorinated Biphenyl (PCB)-containing items (including, but not …
"The scope of the CX Dump Tank Complex Demolition and Site Restoration project includes demolition of all of the components making up the CX Dump...
Remove Pipe Insulation from Battery Room 100 in Building 772-7B.…
The scope of the Waste Processing (WP) Building Demolition and Site Restoration project includes removal and disposal of the building, slab...
Activities addressed by this standard NEPA Review Form include: Routine maintenance and repair activities, Plant rearrangements and/or building mo…