The proposed scope of the project is to improve existing stormwater drainage infrastructure by constructing new stormwater best management practices (BMPs) to improve water quality and control rate and volume of stormwater discharge at Outfall 001 (OF-001
The purpose of the Knolls Laboratory Steam and Condensate Upgrade Project (Project) is to replace significant portions of the existing steam and condensate distribution system that are beyond their useful service life, vulnerable to service disruptions an
The primary purpose of the A4 Building Demolition Project is to remove the existing building to allow for the construction of a modern facility with more office space.
The US Department of Energy (DOE) proposes to demolish and remove Buildings 56 and 64 from the Lawrence Berkeley National Laboratory (LBNL or Berke…
National Nuclear Security Administration (NNSA)’s proposed action is to de-inventory, deactivate, decommission, and perform limited pre-demolition …
National Nuclear Security Administration (NNSA)’s proposed action is to 1) create temporary housing for occupancy 2) provide non-occupancy space fo…
National Nuclear Security Administration’s proposed action is to perform the necessary and routine analytical laboratory operation, research and de…
National Nuclear Security Administration’s (NNSA) proposed action is to perform the necessary and routine administrative actions, training exercise…
The scope of the FSVTL and SVTF support facility project includes the construction of a multistory building extension to the north and/or west of the existing SVTF.
The Western Area Power Administration (vi APA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the …