MSA/HMIS to perform removal of Polychlorinated Biphenyl (PCB)-containing items (including, but not limited to, transformers and capacitors), PCB…
The Knolls Laboratory Building C7 Construction Project covers the design and construction of a new facility to increase space available to support...
Knolls Laboratory-Chemistry Laboratory and Radiological Health Facility, Building T3, Construction Project
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment, transmission towers, and auxiliary e…
The U.S. Department of Energy (DOE) proposes to characterize, dismantle, and disposition switchyard equipment,transmission towers, and auxiliary elec…
The scope of the C-Area Ground Level Parking Project involves the alteration of two temporarygravel parking lots into a permanent asphalt parking lot…
The US Department of Energy (DOE) proposes to modernize and expand the capacity of the LawrenceBerkeley National Laboratory (LBNL) Grizzly Peak Sub…
The Princeton Plasma Physics Laboratory's (PPPL) proposed Critical InfrastructureRecovery and Renewal (CIRR) project would replace old, degraded sy…
"The scope of the East End Land Acquisition (Minchoff Property) includes the initial procurement of
the property and subsequent demolition, remova...
the property and subsequent demolition, remova...
CX-021109: MSC Annual Categorical Exclusion (CX) B1.17, Polychlorinated Biphenyl Removal for CY 2020
The Mission Support Contractor (MSC) and its subcontractors perform removal of Polychlorinated Biphenyl (PCB)-containing items (including, but not …