BPA proposes to perform routine road maintenance, repair, improvements and reconstruction on approximately 1.3 miles (7,000 linear feet) of access …
This revision to the Environmental Compliance Permit (ECP) for the Utah Associated Municipal Power Systems (UAMPS) Carbon Free Power Project (CFPP)…
The proposed project would rework the roadway to a proper slope and grade by creating a road base of compacted pit run gravel, geotextile fabric, g…
This project includes installation of fencing and underground utilities to establish the proper security controls.
The purpose of this revision is to add planned work scope associated with changes to the core boring/well drilling locations proposed for completio…
The scope of the Knolls Laboratory - East Gate Entrance Upgrade Project (Project) is to increase the size of the East Gate vehicle entry and exit l…
MSA/HMIS to perform construction, acquisition, and relocation, consistent with applicable right-of-way conditions and approved land use or transpor…
Construct two new storage pads at the north end of the ATR Complex forheavy equipment and other non-radiological material storage and for low-level…
There are 5 projects proposed as Supplemental Environmental Projects, SEPs, to settle the penalty for DOE-ID in connection with the settlement of a…
Western Area Power Administration, WAPA, Desert Southwest Region, DSW, proposes to repair an existing access road located in Section 24, Township 2…