HMIS Annual Categorical Exclusion (CX) B1.13, Pathways, Short Access Roads, and Rail Lines for CY 2022…
Activity to Install Temporary Access Road Over 300 Basin Emergency Spillway…
The Kesselring Site Southeast Quadrant Decontamination and Dismantlement Project will remediate, dismantle, and dispose of above and below grade structures and utilities associated with Building 5, Building 5A...
Benton-Scooteney No. 1 Transmission Line Rebuild…
BPA proposes to perform routine road maintenance, repair, improvements and reconstruction on approximately 1.3 miles (7,000 linear feet) of access …
This revision to the Environmental Compliance Permit (ECP) for the Utah Associated Municipal Power Systems (UAMPS) Carbon Free Power Project (CFPP)…
The proposed project would rework the roadway to a proper slope and grade by creating a road base of compacted pit run gravel, geotextile fabric, g…
This project includes installation of fencing and underground utilities to establish the proper security controls.
The purpose of this revision is to add planned work scope associated with changes to the core boring/well drilling locations proposed for completio…
The scope of the Knolls Laboratory - East Gate Entrance Upgrade Project (Project) is to increase the size of the East Gate vehicle entry and exit l…