Remove and replace 234 aging existing distribution structures, including poles, crossarms, and insulators, with new components designed to meet mod…
ROW and easement clearance will take place approximately 12 miles from the Lovell Canyon turn off. This will consist of road construction and clear…
Replacing existing aging pole structures with new pole structures.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the County of Carlton to design, develop, and i…
The subrecipient proposes vegetation management to roughly 35 miles of urban circuits along the following: 1) 22 miles (out of the 35-mile circuit)…
Hanford Mission Integration Solutions (HMIS) and their subcontractors perform construction, acquisition, and relocation, consistent with applicable…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
The temporary bypass road will be moved from the West side of Taylor Blvd to the East side. This will increase the area of potential effect (APE) t…
A series of three culverts on Giese Road will be replaced due to structural concerns and to improve the flow of Indian Creek. The existing roadway…
Creating safe pathways down to Joyce Branch for environmental sample collection.…