The objective of this project is to enhance grid reliability, power quality, grid resilience, and increase efficiency through advanced technologies…
LM is responsible for long-term surveillance and maintenance of the Tuba City, Arizona, Disposal Site. LM is proposing the Secondary Source Term an…
Southwest Power Pool (SPP) issued a Notice to Construct to rebuild 4 miles of WAPAs existing 115kV transmission line from Gavins Point Substation t…
Bonneville Power Administration (BPA) proposes to improve and reconstruct existing access roads, construct new access roads, and correct conductor …
Bonneville Power Administration (BPA) proposes to improve and reconstruct existing access roads, construct new access roads, and stabilize landslid…
Installation of AMI system across REC's service territory. Poles and towers will be introduced in portions of the project.…
BPA proposes conducting access road improvements and repairs along the Rocky Reach – Maple Valley No. 1 line from line miles 99 to 103. The work wo…
Facility B21-615, a newly constructed building located at the Central Facilities Area (CFA) Gun Range, currently has limited access. At present, en…
Bonneville Power Administration (BPA) plans to upgrade miles 4 through 33 of the LaPine-Fort Rock 115kV Transmission Line's access road system in K…
EECA proposes the dedication of three acres for the construction of a new electric substation. The site would require perimeter fencing. Site is i…