Nogales Substation Temporary Laydown Yard CX(s) Applied: B1.3 Date: 03/28/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Algae Testbed Public-Private Partnership (ATP3) - a RAFT Partnership CX(s) Applied: A9, B3.6, B5.15 Date: 01/16/2014 Location(s): Arizona Offices(s): Golden Field Office
Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 01/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region
Assisting the Tooling and Machining Industry to Become Energy Efficient CX(s) Applied: A9 Date: 12/10/2012 Location(s): Arizona Offices(s): Golden Field Office
In-situ X-ray Nanocharacterization of Defect Kinetics in Chalcogenide Solar Cell CX(s) Applied: A9, B3.6 Date: 12/04/2012 Location(s): Arizona Offices(s): Golden Field Office
Install 200 Kilowatt Solar Photovoltaic System and Routine Maintenance Actions CX(s) Applied: B1.3, B1.19, B5.16 Date: 11/02/2012 Location(s): Arizona Offices(s): Legacy Management
Halide and Oxy-Halide Eutectic Systems for High Performance High Temperature Heat Transfer Fluids CX(s) Applied: B3.6 Date: 09/10/2012 Location(s): Arizona Offices(s): Golden Field Office
Energy Efficiency and Conservation Block Grant Program CX(s) Applied: B5.23 Date: 09/05/2012 Location(s): Arizona Offices(s): Golden Field Office
Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 08/01/2012 Location(s): Arizona, Colorado, Oregon, Texas, Washington Offices(s): National Energy Technology Laboratory
Recovery Act Arizona Geological Survey Contributions to the National Geothermal Data System CX(s) Applied: B3.1, B3.6 Date: 07/26/2012 Location(s): Arizona Offices(s): Golden Field Office