Replace 116 utility poles in place (with taller poles), transfer an existing medium voltage circuit, secondaries, and telecom equipment to the new …
Installation of three sets of new pole mounted fiber optic sensors, a new motor-operated three-way high-voltage switch with vacuum interrupter tech…
UMass Amherst plans to upgrade the campus's existing medium voltage electric distribution system through the installation of five Automatic Transfe…
Design, installation, and operation of a iron-air multi-day storage system: which would include: site grading and temporary construction facilities…
Project's primary objective is site characterization including a 3D seismic survey in Chambers, Jefferson, and Liberty counties, TX.…
Project's primary objective is to complete a storage complex feasibility study. This CX covers only Group A activities, which include routine admin…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Metlakatla Indian Community to fund the des…
The project shall consist of the design and installation of a new substation transformer as well as construction of storage pad for existing transf…
In-kind replacement of existing overhead top of pole electric cable, utilizing the majority of existing utility poles, replacing pole top conductor…