LM is proposing to amend Categorical Exclusion Evaluation (CXE) Form LM 11-21 to conduct project-specific safeguarding activities at fourteen open …
This new CX determination has been signed due to the addition of project locations for additional EV charger installation activities. …
This new CX determination has been signed due to the addition of project locations for additional EV charger installation activities. …
DOE-LM is proposing to conduct routine inspections, groundwater and surface water monitoring, and routine maintenance activities at the Green River…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the City of Chicago Department of Environment f…
Construction of a converter station and an overhead high voltage direct current (HVDC) transmission line in the Nikiski area, a submarine HVCD cabl…
BUECI plans to upgrade existing aged switchgear with modern, better weatherized vacuum circuit breakers and protective relays. The new system will …
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the California State University Maritime Academ…
Project's primary objective is site characterization including water sample collection, drilling an USDW well, aerial studies, soil gas sampling, a…
The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) is proposing to provide technical assistance to the Federal Geoth…