Categorical Exclusion Determinations: A1

The scope of this project is to provide for the construction of a bulk fuel tank farm in Ambler, Alaska to be owned and operated by the City of Amb…
The Recipient team will investigate the feasibility of a Direct Air Capture (DAC) Hub at a midwest location anchored by Siemens Energy's solid sorb…
Fervo-execute a detailed feasibility study. AirMyne-DAC partner. UGS-assist with subsurface seq. pot. EGI-assist with geothermal systems modeling.…
The Recipient will perform studies to determine the structure of a DAC Hub located near the Tuscaloosa Group saline aquifers in Florida and the fea…