The U. S. Department of Energy, U. S. Environmental Protection Agency, and South Carolina Department of Health and Environmental Control agreed tha…
Relocation of Drive-Thru Rapid COVID Testing Station from B-Area (735-4B) to N-Area (719-5N).…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system.…
Replace Carpet In Room 102, 772-F.…
This EEC covers the use of a Labconco benchtop lyophilizer and the lyophilization (freeze-drying) of nonhazardous aqueous samples.…
Remove out-of-service steam line section near 717-A.…
Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
The loose packing material needs to be removed and replaced and the joint caulked to ensure the packing material does not continue to pull out.…
Water damaged beams in buildings 717-1N, 717-3N, 717-8N, 711-N, 711-2N, 711-9N, will be cleaned and have new coatings applied.…
Verizon Wireless is upgrading the existing Mobile Access Distributed Antenna System (DAS) and multiple repeater sites located on the SRS facility t…