Remove/replace 703-25B front and rear wooden steps/decking and replace with aluminum.…
Remove Radiation Monitors from Local Control Stations (LCS-66 and LCS-67) per DCP No. J-DCP-S-05003.…
Restroom trailers 742-10G and 742-11G built in 1993 (519 square feet each) will have services disconnected, and the trailers will be removed from t…
Repair sheetrock wall due to water intrusion on north wall of Room 150 in Building 735-B.…
The oil-filled windows for Building 773-A Shielded Cells 7, 9, and 13 are in need of replacement due to significant oil leakage, which is causing a…
Award Number: DE-EE0009456, CX(s) Applied: A9, A11, Building Technologies Office, Location(s): GA, Office(s): Golden Field Office
Award Number: DE-EE0009437, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): VA, Office(s): Golden Field Office
Award Number: DE-EE0009435, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): MO, Office(s): Golden Field Office
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.6, National Renewable Energy Laboratory, Location(s): CO, Office(s): Golden Field Office
BPA proposes to disassemble and remove the Big Eddy Direct Current Test Line because the de-energized transmission line is no longer in service. …