To advance a novel structured material system comprising a highly dispersed sorbent with a low-pressure drop support for direct air capture from p…
WUSTL will advance the integration of a Ti-Ce electrode-decoupled redox flow battery system with conventional fossil-fueled power plants through d…
The crude oil surge tank BHT-7 will be taken out-of-service to clean it and perform a complete internal and external API 653 inspection.
Perform an inspection of the BM 30-inch crude oil pipeline at the location(s) indicated by smart pig surveys.
The Mobile Melt Consolidation (MMC) Project components will be installed at 645-N.…
Piping and supports will be modified to support Saltstone Hopper Overflow Container (SHOC) Modifications.…
Install HPC Time Server Antenna and Cable in 707-C and 703-44A.…
Re-route 772-1F steam condensate discharge.…
This carbon contamination technique referred to as regeneration will be conducted per temporary modification 233H-TMC-15-181, associated WO 1389965…
Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area.…