The purpose of the design change is to replace the steel drain pipes with PVC where the steel lines exit the concrete of the building.…
Remove trees, underbrush, and all unwanted vegetation around the perimeter of K-Ash basin.…
L-Basin HFIR Resin Cleaning Stations.…
With increasing workloads and incoming new hires, the need to upgrade the CCR has become a priority.…
Installation of transient voltage surge suppressors in the Z-Area Saltstone Facility Process Room…
Subcontractor will provide roof repairs at 785-6A.…
CX-023698: Relocate Delta V Servers from 248-H to 264-H and Install Delta V Computer in Control Room
Transition Unclassified DeltaV DCS servers from 248-H room 112 to 264-H room 102, and install Delta V Computer in Control Room.…
Project Y-757 replaces E3S with the Argus Security System for components not already identified by Projects Y-738, Y-732 and Y-724 in the Tritium F…
This modification will replace E3S in the Tritium Extraction Facility (TEF) with the Lawrence-Livermore National Laboratory (LLNL) Argus Security S…
Grade, Pave, Stripe and Add Erosion Control Measures to Existing Gravel Parking Lot at 742-G trailers.…