Install two (2) metal Quonset Huts to support the construction workforce in S-Area Laydown Yard.…
The Saltstone Dry Material Pre-Mix Screw Feeder is to be replaced due to it being obsolete.…
Attach approximately 1,056 square feet of 4’ X 8’ sound absorbing acoustical tiles on walls in Buildings 730-B (Rm 333), 730-2B (10'x20' room) and …
Replace 37 entrance doors at the B-Area trailer complex.…
Install 9 Universal Wiring (UW) drops in Building 772-F, Room 102.…
Replace and rewire all telecommunications/network circuits in 707-7F.…
Design and procurement for replacement Glovebox Oxygen Monitor System for HANM Secondary Stripper.…
Install new Universal Wiring in 705-H.…
This activity is to remove peeling, asbestos insulation on piping in 701-1H Room 14.…
The purpose of the design change is to replace the steel drain pipes with PVC where the steel lines exit the concrete of the building.…