This Tritium facility modification project is being initiated to procure and install a new vault door as a replacement for the current door set in …
We are removing the valve and thus converting the fire suppression system in Room 54 to a permanently "wet" system.…
The scope is to design and replace the IML AHU system with equivalent equipment that is more reliable and maintainable.…
Renovations are needed in Building 246-H. Enhancements will be made to flooring, common areas, and exterior signage.…
The Ingersoll Rand SSR-XP10 air compressor and Parker Airtek TW25 air dryer, along with the air dryer pre filter and after filter, are to be remove…
The purpose of this modification is to provide for the design, fabrication, and installation of new extraction equipment stands and cask trolley to…
The proposed activity (PA) is a redesign of the existing Modular Stripper (MDST) blowers under MT-TRI-2021-00034.…
Proposed activity provides for the procurement and installation of a backup set of Dead Weight Testers in the Building 234-H (HAOM) Hot Calibration…
The U.S. Department of Energy (DOE) is proposing to provide funding to T2C-Energy (T2C) to develop plans to scale up their preexisting pilot-scale …