Provide federal funding to BHER Minerals, LLC to demonstrate the ability to produce lithium hydroxide monohydrate from lithium chloride extracted f…
BPA proposes to allow Clark Regional Wastewater District (CRWWD) to replace a sewer line within a BPA fee-owned transmission line corridor in Vanco…
BPA proposes to conduct ford maintenance along an access road that services the line known as Tanner Creek Road or USFS Road 777.…
BPA proposes to remove the tops from approximately 3,100 danger trees that pose a potential risk of impacting BPA’s Jones Canyon-Santiam No. 1 230-…
The purpose of this project is to advance manufacturing capabilities to improve energy efficiency.…
The subcontractor shall furnish all equipment required to remove old fiber optic cabling from cable trays, fencing, and from raceways into the site…
This project includes installation of fencing and underground utilities to establish the proper security controls.
Provide funding to GE Research to develop and demonstrate an integrated additive manufacturing process for novel high-performance blade designs for…
Provide funding to University of Colorado Boulder (UCB) to develop a process for alloy identification/characterization utilizing quantum mechanics …
Provide funding to Caterpillar, Inc. (Caterpillar) to develop and demonstrate a 2.0 MW (electric) flexible natural gas/hydrogen combined heat and p…