This tile will be picked up for disposal and the remaining piece of tile that is still attached to the floor will be removed and new tile will be p…
This work is part of a statewide initiative to increase gopher frog populations and potentially help the species avoid federal listing in 2025.…
Install AC Current Monitoring on select Saltstone Facility equipment.…
The Proposed Activity provides permanent power to the HVAC unit.…
This modification will replace the existing 234-H FACP with the manufacturer’s suggested replacement panel that will provide compatibility with all…
The DCF outlines some caustic delivery improvements to 221-H through piping modifications and repurposing.…
To prevent water intrusion into the 105-K Building at the North Side Handball Court area, prep and apply Blue Max sealant in roof plugs area.…
Clean and repaint walls in 701-1K.…
Volatile compounds from resin curing and treatment will be collected into thermal desorption tubes or SPME fibers using dynamic headspace analysis.…
This work will provide installation of vent line piping to each of the four existing Gas Chromatographs (GC) hoods located in 735-11A Lab 135 for a…