Develop tools, educational resources, and training on energy sector security from cyber and physical threats, energy sector preparedness, response…
BPA proposes to replace insulators on four structures on the 230-kV N. …
BPA proposes to continue funding the Columbia River Inter-Tribal Fish Commission (CRITFC) to implement the objectives and actions outlined in the T…
Provide funding to the Hualapai Indian Tribe for the construction and interconnection of a 993 kW solar array and 750kW/1500kWh lithium battery ban…
The purpose of the proposed chemical fuel dissolution technique is to remove the fuel without causing damage to the microstructure of the fuel’s cl…
NARUC will utilize its expertise in state energy policy, planning, and data analysis, as well as its unique position as a state convener to support…
BPA proposes to upgrade substation equipment and associated reconfiguration of some transmission lines’ approach and termination connection to the …
The project would install a new septic system (septic tank and drain field) at the MFC-721 Transient Reactor Test (TREAT) office building.…
BPA proposes to provide system reliability by replacing old and worn spacer dampers on the Broadview-Garrison No. 2 transmission line at transmissi…
BPA proposes to integrate a small generation project into its balancing authority (BA) in response to a request from Snohomish Public Utility Distr…