BPA proposes to work in conjunction with Mason County Public Utility District (PUD) 3 and Jefferson County PUD (separately) to upgrade fiber optic …
The scope of the Component Test Complex project includes constructing a new facility and utility infrastructure required to support the Bettis Laboratory Thermal Hydraulics Laboratory testing which is currently located at Bettis in the Hangar 2 Building.
BPA proposes to interconnect Avangrid’s 202-megawatt (MW) solar development project with BPA’s electrical system at Maupin Substation. …
BPA proposes to acquire an existing radio tower located at the Mt. Spokane Radio Microwave Station operated by BPA in Spokane County, Washington. …
Washington State University (WSU) proposes to enhance the safety, performance, and continued operational reliability of the WSU Nuclear Science Center 1 MW TRIGA reactor by 1) restoring the reactor tank concrete, which is in much need of repair due to epoxy failure, and 2) replacing the epoxy concrete tank liner with a modern, robust epoxy liner.
The University of Wisconsin (UW) proposes to enhance the neutron radiography capabilities at the UW Nuclear Reactor (UWNR) and associated Characterization Laboratory for Irradiated Materials (CLIM), by acquiring a high-resolution detector, rotation stage, visualization software and a high-performance computer.
The University of Maryland (UMD) proposes to replace the Radiation Area Monitors (RAMs) for the Maryland University Training Reactor (MUTR).
Stony Brook University (SBU) proposes to acquire instrumentation to provide dedicated sample preparation, and multipurpose in situ heating and mech…
Texas A and M University proposes to (1) upgrade one gas ion source to a Toroidal Volume Ion Source (TORVIS) source to increase the proton beam cur…
The University of Texas at San Antonio (UTSA) proposes to expand the existing fuel fabrication capability of its Extreme Environment Materials Labo…