Implement stormwater erosion and sedimentation control improvements within the Savannah River Tritium Enterprise (SRTE) per Work Orders.…
This is a painting job to repaint walls and floors in the HCMA vestibule and adjacent room.…
Repaint the flagpole North of 704-H.…
Remove weeds via pulling, cutting, clipping in the K-Area Sand Filter and Settler Tank Area.…
Prepare Clausing drill press for excess by disconnecting electrical, and transporting to storage.…
EEC for rheometers that use NIST traceable oil standards for verifying the functionality of the instruments.…
Install new Mlab 200R printer in Room 2 of 723-15A.…
294-F is out of service and no longer requires steam.…
Remove and Excess existing plate roller in building 717-3N and install a new plate roller.…
A simulant of the accelerated basin deinventory (ABD) dissolver solution will be prepared and then neutralized with sodium hydroxide.…