Bonneville Power Administration (BPA) is proposing to install a new communications line to the Warren Substation power control assembly (PCA) build…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Washington (UW) to upgrade and deploy hydrophone instrumen…
The NDDOT and FHWA are proposing to upgrade approximately 62 miles of US HWY-85 to accommodate additional lanes of traffic.…
Mexico Pacific Limited LLC (MPL) asks DOE to extend its 20-year export term in Order No. 4312 to a term ending on December 31, 2050.
Develop mini-guide for public utility commissioners.…
Perform a FEED study to facilitate a future investment decision in a DAC hub project by validating the commercial case for utilizing nuclear energy…
Install a pressure reducing valve in both Inert Load Lines in accessible locations that allow the operator to monitor delivery gas pressure and loa…
Subcontractor will perform a core sampling of roofs Buildings 232-H, 264-H, and 264-2H with the SRS asbestos group. Sampling locations will be patc…
Installation and Operation of LM-1 Degausser and DX-8 Destruction device for fast destruction of hard drives in Building 226-F. …
BPA proposes to fund the Idaho Department of Fish and Game to decommission and obliterate two existing irrigation ditches that divert water from th…