The proposed project would be for the Nevada National Security Site Management and Operating (M and O) Contractor to install up to five (5) USAF mo…
The overall objective of the work is to convert a commercially available tube-in-plate heat exchanger to be a contactor for direct air capture (DAC…
Develop an advanced CO2 mineralization technology for coproduction of value-added carbonate and fertilizer products.…
Real-time operational training data from bituminous coal-fired boiler at the Pacificorp Plant will be fed into the Miniaturized High-Temperature Mu…
Monitor deformation continuously during Utah FORGE operations using both surface and downhole strainmeters, tiltmeters, and seismometers…
713-4N Replace door at Pipe Yard office.…
704-3N Correct walkway.…
Fabricate and replace the existing guardrails on the dock at 713-2N.…
766-H Install PA speakers.…