Refurbish the old excess yard (763-52N).…
The 50-ohm resistance thermal device (RTD) for 6.2F will be replaced with a 100-ohm platinum (Pt) RTD. The associated recorder shall be reprogramme…
Bonneville Power Administration (BPA) is proposing to replace deteriorating wood pole structures and any associated hardware and guys on the Nasell…
Bonneville Power Administration (BPA) proposes to allow The City of Vancouver (City) to construct a paved concrete trail within a BPA fee-owned tra…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace distribution structures and install all-dielectric self-…
Two independent activities will take place: 1) Chemical adsorption/absorption studies, and 2) X-Ray fluorescence and associated activities.…
Planning, permitting, and outreach, monitor methane emissions, abandoned mine shaft sealing, initiate methane capture and design water manufacturin…
Removal of electrical to door 313 and 320 in 105-L and door 313 to be removed from building.…
A more suitable location to gauge field parameters at station L3R1-A was identified. The following activities will take place to establish the new …
Comprehensive Force-on-Force (CFoF) exercises that are conducted by Centerra-SRS are as realistic as possible and conducted in a safe manner.…