The U. S. Department of Energy, U. S. Environmental Protection Agency, and South Carolina Department of Health and Environmental Control agreed tha…
Southern Sector airlift recirculation wells SSR-002 to SSR-012 to be placed out-of-commission and abandoned in place.…
The A-2 Air Stripper has completed its cleanup mission. The South Carolina Department of Health and Environmental Control has agreed that the unit …
617-G Replace floor tiles.…
Isolation of the Confinement Heat Removal (CHR) System from the disassembly basin in K-Area. Revision 1 only to extend activity end date.…
This modification will install a security barrier at Building 105-K air handling unit's duct penetration point.…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
Design and install new stand-alone permissive circuits for Safety Significant (SS) portions of the door scheme along with all the remaining permiss…
Scope-Clean oil spill in 715-3N fuel dike and repair pressure control device.…
Activation of molecular sieve adsorbents by flushing helium through the adsorbent while heating to remove adsorbed water and air.…