The U.S. Department of Energy (DOE) is proposing to provide funding to the Karuk Tribe to install solar PV systems for commercial buildings and Eld…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No 2 230kV transmission line, between structures 66-3-6…
WAPA is proposing to rebuild and reroute approximately 2 miles of the Bismarck to Jamestown No. 2 230kV transmission line, between structures 66/3-…
Thermal Cycle Absorption Process (TCAP) Product Bed C is to be replaced by new components.…
Utilization and modification of 706-3F, 2nd floor to perform engineering classified computing task to support NNSA missions.…
Bonneville Power Administration (BPA) proposes to install a 20-foot gate on the existing fence at the NW Corner of the BPA Harney Substation. An en…
LM proposes to maintain ongoing facility use operations by LM and stakeholders performing routine inspections, site visits and tours, and routine m…
LM proposes to maintain ongoing facility use operations by LM and stakeholders performing routine inspections, site visits and tours, and routine m…
New D3 consoles will be added to TEF and HANM facilities.…
Bonneville Power Administration (BPA) proposes to modernize its Richland Substation, located in Richland, Washington. The work would largely consis…