Augusta Industrial will clean up and dispose of bird droppings in SRTE, Building 232-H Truckwell.…
Replace HVAC Heat Pumps and Air Handling Units for Buildings 247-H and 248-H. Existing units are original components and have reached the end of th…
This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
TCAP Column B, along with TCAP Product Storage Bed A are to be replaced by new components.…
The scope of this task will replace the diesel engine and generator and consolidate and or replace the existing 4 Motor Control Centers (MCCs) in B…
The potential for environmental improvement noted in the research proposal refers to the fact that our research plan involves discussion of climate…
Renovate conferences rooms and adjacent corridors, entries, restrooms, and kitchenette in B-922 at NETL Pittsburgh, PA.…
Hot work activities using small handheld butane or methane/oxygen torches – including general glass work (e.g., fire polishing, bending, connecting…
Bonneville Power Administration (BPA) proposes to replace an existing two-pole suspension structure and associated structural and electrical compon…
Bonneville Power Administration (BPA) proposes to upgrade two radio station sites with new antennas and equipment. This CX has been updated to incl…