SRNS will perform onsite project management services and will be responsible for the installation of fiber (FedNet), construction of a new domestic…
A lab scale jaw crusher will be used at ACTL to perform size reduction of ceramic or glass materials.…
New doublewide trailers (2 ft x 69 ft) have been purchased to provide additional space for engineering personnel.…
Install an additional check valve on the outlet of each primary purge compressor for the Chemical Process Cell (CPC) systems.…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
Surveys the linearity of the electrodes, as well as determining the detection limits in various matrices. Analysis will be done with an Orion Versa…
Removal of asbestos insulation needed to repair steam leak at 218-H…
Add an additional portable BA header to run a second portable BA system simultaneously to support additional users at one time.…
613-7A Parking lot seal and restripe.…
This EEC covers analytical methods for Radiochemical Measurements. This revision includes new chemical being added.…