A new carport/canopy will be installed south of 730-4B for unloading materials.…
Revision 1 covers additional maintenance needs assoicated with flooring and underpinning.…
Synthesis of intermetallic compounds using flux growth.…
Subcontractor will provide gutter repair at 773-A, C-030.…
DWPF pour stream (PS) high-level waste glass samples from Sludge Batch 9 (SB9) are sampled and sent to SRNL for analysis and for archiving in E-win…
This EEC covers various general renovations for Building 781-A, such as flooring/cove base replacement, ceiling tile replacement, drilling, paintin…
The mass spectrometer will be used to measure the composition of gases from laboratory experiments at 999-1W. The VICI Metronics Dynacalibrator wil…
Bonneville Power Administration (BPA) proposes to fund Oregon Department of Fish and Wildlife (ODFW) to construct, fabricate, and install fish scre…
Complete front-end engineering design (FEED) and develop cost estimate for CO2 capture from cement plant flue gas
The recipient will evaluate the University's current R and D capabilities, and identify the gaps for other required resources to develop FECM-relat…