Cut valve internals out and replace, welding and grinding is required.…
Airborne dust enters Building 218-1H through the five wall air intake louvers, which are not equipped with filters.…
Remove existing carpet tiles, floor tiles and mastic beneath carpet in room 216 and 36 in 234-H. Place new mastic and carpet in both rooms.…
Install an electric vehicle charging station (EVCS) at the Fernald Preserve Visitor Center (VC).…
Construction Craft to paint office areas in 248-H. Prior to painting, they will repair damaged wall surfaces by filling and sanding them smooth. Vi…
Assess and replace 234-H roof drain piping as applicable.…
Replace 233-H ELU-1 and ELU-5 lights with Light Emitting Diodes (LEDs) per E-DCF-H-09681…
The U.S. Department of Energy (DOE) is proposing to provide funding to the University of Vermont (UVM) to develop tools and processes to help commu…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Louisiana State Energy Office to install light poles with energy efficie…
DOE LM is proposing to install (one) Level 2 Beam EV ARC 2020 100 percent dual-port with solar and battery array, transportable, grid-independent E…