The objective of this effort is to design and install a modular, pilot-scale test unit to process 10,000 gallons per day (gal/day) or 7 gallons per…
Project management, simulation work,electrolysis to methanol short stack of individually connected cells to test and validate methanol production f…
Bench-scale research and development of an electrochemical reactor for direct ocean CO2 capture, as well as data analysis, technoeconomic analyses,…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new ab…
The purpose of the proposed project is to replace the existing underground storage tanks (USTs) and fuel dispensers at Building (B) 611 with new aboveground storage tanks (ASTs) and fuel dispensers.
This activity prepares H-Canyon and Outside Facilities (H-OF) samples for metal impurities analysis by either Inductively-Coupled Plasma Mass Spect…
735-2B has a cylinder containing tritium in nitrogen carrier gas that has a malfunctioning main valve. They are unable to return it to the vender a…
This EEC covers prepping and painting piping in riser rooms in N-Area (711-2N, 717-5N, 717-10N and 713-1N).…
Refurbish 221-H 4th level lunchroom due to normal wear and tear and age of the lunchroom.…
Refurbish 211-43H (Ice Cream Trailer) to maintain capability and functionality.…