The Bonneville Power Administration (BPA) proposes to enter into a land use agreement (LURR) with Harold Sorensen Trucking (HST) to construct an em…
This Amended Determination follows the approval of additional funds and schedule to support the project teams small-scale research and development …
Vendor will install bottle filling water stations near the kitchens on the second and third floors of 730-4B.…
Funding will support the project team's research and development of their Geomechanical Pumped Storage (GPS) methodology that uses the Earth as a m…
Funding will support the project team's research and development of a high-power density, efficient, cost- ffective, and convenient United States-m…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…
Rev. 0: Site construction will be replacing the bolts on catwalk/ladder and painting the M-1 Air Stripper and associated components as well as the …
T3 transformer in the L reactor area is being replaced. EP number is 105L-573.3. CLI number is L-105000-NEP-SWGR-T3-XFMR-3.…