The failed roofing system on the 704-L roof will be demolished and replaced. This will prevent numerous leaks that currently plague the building.…
Filters will be replaced, units will be DOP tested and ventilation tested.…
Replace a door at building 701-3G (Barnwell Barricade).…
The current battery bank substation in 251-H will be removed and replaced with new batteries of the same type.…
The sole amendment to the prior NEPA Determinations is a change in one location of work, moving from Jet Propulsion Laboratory in Pasadena, Califor…
This Third Amended Determination adds 5 projects (Columbia University, University of Kentucky, Pacific Northwest National Laboratory, Travertine Te…
703-46A Install 1 UW Drop in Room 266.…
702-A Install Keri door on entry No. 4.…
The proposed activity will cover the connection, operation, and disconnection of air sampling systems in 773-A E-023 for effluent monitoring and ch…
N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…