Construction is to repair pipe penetration at 700 basin, as well as seal the joint where the basin wall meets the basin floor.…
This activity will correct/replace the internal components of 285-11H cooling tower cells that have worn due to normal wear and tear.…
Replace 248-H Wet Chemical Agent Cylinder due to Age…
Laboratory testing to develop a prototype with the ability to separate freshwater from concentrated produced water, lab testing of building panels,…
The U.S. Department of Energy (DOE) is proposing to provide funding to Natel Energy Holdings, Inc. (Natel) to develop a laboratory strike test and …
The U.S. Department of Energy (DOE) is proposing to provide funding to University of Wisconsin-Madison (UW-Madison) to design and develop aerobic o…
The U.S. Department of Energy (DOE) is proposing to provide funding to the City of St. Cloud, MN for the design, development, installation, field t…
The United States Department of Energy (DOE) is proposing to provide federal funding to the Electric Power Research Institute (EPRI) for the develo…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Nth Cycle Incorporated for the development, fabrication, and testing…
The U.S. Department of Energy (DOE) is proposing to provide funding to Natel Energy Holdings, Inc. (Natel) to develop a laboratory strike test and …