It is anticipated that additional electrical capacity will be required by Construction during the CY 25 outage within Building 233-H to provide pow…
This EEC addresses the MT to design and install new rotameters to replace the obsolete rotameters in the 234-H Tritium Air Monitoring system.…
To develop a novel single-stage dual-layer RPSA (Rapid Pressure Swing Adsorption) process for high purity oxygen production.…
Installation of a walking/cart path in-between 704-J and 221-J and another walking/cart path south and west of 704-J to an installation of a rad co…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
This EEC supports the repair of the Air Handling Unit No. 3 at Building 772-F.…
Renovate interior at 284-19H and 284-20H.…
Paint piping at 905-53A. Evaluate and Correct Well 905-53A.…
Design, fabricate, assemble and test a fuel reformer on a natural test engine.…
The project’s overall scope is to assess the basin's resources (including sample collection and analysis), potential options for processing those r…