Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…
Replace Lift Station Pumps at 607-66G.…
Six single-wide trailers will be removed and replaced with three new double-wide trailers near gate 16.…
B-Area replacing trailer doors due to water damage.…
The dust collector (Z-205000-BMH-DCOL-0002) for Silo No. 4 is to be replaced.…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
Flow sensors are planned for installation at two locations in D Area. One will be installed in the discharge canal (DSWM-8B) and D006 outfall (DSWM…
This scope of this project is upgrading the access to CITRC Pad D. Current condition do no allow for use of the test pad in inclement weather. A gr…
In this analysis, DOE has found that the 2022 edition of ANSI/ASHRAE/IES Standard 90.1-2022, "Energy Standard for Buildings Except Low-Rise Residen…